Sunday, April 26, 2009

Master Bath Floor - Day 3 of Tiling

Saturday, April 25th
The toilet was removed,the linoleum taken up in the toilet room and that floor was scraped.
A new shut-off valve was installed.

10 more pieces of tile were installed

No comments: