Friday, October 01, 2010

Granite Installation

Thursday, Stone Resources was here to install the granite.
It took 3 guys, about 3 hours to install 6 pieces of granite
(the bartop is 3 pieces seamed together;
the sink piece is all one section,
and each section by the stove is all one section).

The undermount stainless steel sink was also installed.
Side view of the bar top...we added a modest curve to the bar instead of leaving it straight.
The entire kitchen
The section to the right of the stove.

A better view of the undermount sink